Here are some examples of our work within the construction industry. To request a quote, please click HERE.
Construction - Experience the difference! - Experience Sicklesteel Cranes
Sicklesteel's task was to lift two (2) 200' long sections of an 80-year-old bridge weighing 160,000# each from over the Sauk River to allow for demolition. While the first section was mostly over the approach a... Read More
The Fremont Bridge which was opened on July 4, 1917 required seismic retrofitting adn upgrading including the replacement of existing approaches. Just 30 feet above water, the bridge rises for marine traffic on... Read More
Sicklesteel is a recognized leader in the erection of pre-cast concrete panel tilt-ups. Not only have we erected some of the largest panels around (up to 250,000#), but, in the last 20 years, we have had more t... Read More
Sicklesteel Cranes has the largest selection of hydraulic cranes in the Pacific Northwest to assist with the erection of tower cranes. Additionally, Sicklesteel offers certified tower crane operators, certified... Read More
The client completely renovated the previous arena including the installation of a new roof structure and design. This complicated roof design required installation of 150' long, curved trusses at a 30-degree a... Read More